aboutsummaryrefslogtreecommitdiffstats
path: root/docs/ci/index.rst
diff options
context:
space:
mode:
authorEric Anholt <[email protected]>2020-06-16 16:34:11 -0700
committerMarge Bot <[email protected]>2020-07-08 20:13:11 +0000
commit21e6d67a2e2197b8b55e3e641037290a0a850c9b (patch)
tree60a9d24002f65a56913e64b39685cc69f47ca035 /docs/ci/index.rst
parent27c9272c3d72894ac7675cb542fdaccf1b89fd41 (diff)
docs: Relax the expectations of HW CI farms.
We've been doing pretty well at around half an hour per pipeline, no need to be too harsh. Reviewed-by: Eric Engestrom <[email protected]> Reviewed-by: Erik Faye-Lund <[email protected]> Part-of: <https://gitlab.freedesktop.org/mesa/mesa/-/merge_requests/5510>
Diffstat (limited to 'docs/ci/index.rst')
-rw-r--r--docs/ci/index.rst5
1 files changed, 2 insertions, 3 deletions
diff --git a/docs/ci/index.rst b/docs/ci/index.rst
index 4055f876f91..e191d471f0d 100644
--- a/docs/ci/index.rst
+++ b/docs/ci/index.rst
@@ -99,9 +99,8 @@ unacceptable cost to the project.
Additionally, the test farm needs to be able to provide a short enough
turnaround time that we can get our MRs through marge-bot without the
pipeline backing up. As a result, we require that the test farm be
-able to handle a whole pipeline's worth of jobs in less than 5 minutes
-(to compare, the build stage is about 10 minutes, if you could get all
-your jobs scheduled on the shared runners in time.).
+able to handle a whole pipeline's worth of jobs in less than 15 minutes
+(to compare, the build stage is about 10 minutes).
If a test farm is short the HW to provide these guarantees, consider
dropping tests to reduce runtime.